Wood is developing the master plan and early design for the 亨伯河零 carbon reduction programme, 横跨伊明汉的三家发电厂和石化厂, UK. 在接下来的十年里, 我们将开发捕捉的技术, 治疗, and compress up to 800万吨 of carbon dioxide per annum for permanent storage in geological formations beneath the North Sea.
亨伯河零 incorporates a cluster of energy-intensive industries that lie on the south bank of the River Humber. 关闭 to offshore gas storage fields and sitting along a key pipeline route identified by National Grid to connect and decarbonise other key industry in the southern Humber, it is an ideal gateway project for large-scale decarbonisation in the wider region.
拥有数十年的多部门经验, Wood is focused on driving the global energy transition and enabling such flagship projects which could become a model for industrial decarbonisation around the world. It will also play an important role in helping the UK government meet its ambitious energy targets, 包括到2050年实现净零排放.
Evaluating the specific needs of different industrial processes on three operating sites has led to a plan involving several complementary technologies, including use of renewable power to generate green hydrogen through electrolysis, 生成蓝色氢与集成碳捕获, 以及从现有烟囱中捕获燃烧后的碳.
Establishing a local network of both 氢 and CO2 in the Immingham area will allow the region to expand its decarbonisation initiatives in future, and act as hubs to encourage growth of new technologies such as green hydrogen.
Using our technical know-how with our decarbonisation roadmap process (SCORE), we were able to rapidly select an integrated configuration and optimise the performance benefiting all the project partners.
我们明确了范围, 区域要求, 时间表, cost and economic performance which the partners were able to use to support their application for government funding for the next phases of the project.
除了, we developed a publicly accessible interactive online tool and repository for sharing key information about the project. 这允许用户熟悉作用域, performance and economics of the project; envisage the project development using GIS mapping and fly-through videos; explore the technical definition of project element scopes and directly access project deliverables; and run sensitivity cases on project economics.
The 亨伯零号项目 will form a significant element of the UK’s industrial decarbonisation strategy, 占亨伯赛德产业集群的三分之一. 它是五家分店之一,另外两家是提赛德, 默西塞德郡, South Wales and North East 苏格兰 – identified as well-suited to early carbon capture, usage and storage (CCUS) deployment by the Committee of Climate Change (CCC).